Blue operates on a 5-phase process, namely:
Planning Phase
This includes all of the precursor work required
to understand the client’s requirements in order
to brief the project into our development teams. Typically,
we utilise the following planning process:
- Initial client contact and baseline investigation.
- Strategic project planning and proposal.
- Submission of project proposal, timing plan and
Cost Estimate document to client.
- Upon approval of the above, creation of a functional
specification document (non-technical) with a separate
technical specification document, if required (dependant
on the complexity of the project).
- Workshops with client to achieve agreement on,
and thus refine, the baseline planning and/or functional
specification document.
Design Phase
The design phase is divided into
3 distinct stages:
- Design Concept
This is the establishment of the overall look-and-feel
for the site, as well as the first integration of
the company brand into the base site structure.
This would be expressed in the form of 2-3 design
styles, from which the client would choose one.
- Design Development
This stage would develop the approved
base design concept and incorporate the next round
of design adjustments. This would also chart the
sitemap links and functions on the actual site design.
- Design Refinement
The design refinement stage would complete the web
front-end design and, from here,the site would be
able to simply and seamlessly integrate with all
of the technology features and functions to be incorporated
into the site on the backend.
Functional IT Development Phase
This includes the build and development
of all back-end features and functionality to be incorporated
into the web system, according to the following development
process:
- Production of functional aspects and environment
- Planning of complete site and system usability
framework
- Production of system interface pages
- Prototype build with fully operating interface
and functional aspects.
- Prototype presentation
- Prototype approval
Testing, Training and Make-Ready Phase
Once the web system has been completely
built and is a state of market readiness, the final
phase (prior to launch) is comprised of:
- System testing by developers, clients and test
users to ensure its scalability, stress-test levels
and robustness
- Training of system users, if required
- Finalising of system hosting, system registration
and software licensing
Final System Approval and ‘Go-Live’
This phase indicates that the web
system is ready for launch into the open web environment
and it is recommended that this be performed in concert
with a wider marketing and promotional campaign. Please
speak with us if this is a function that you would
like to discuss. We are more than happy to assist
in this regard. The launch process may be outlined
as follows:
- Final system and internal user checks
- Final system approval
- System Launch